New cellular Interview and Task Space rooms were constructed to meet the specific acoustic standards required by the client’s business.
The project also involved the installation of new power, lighting, and data systems, along with modifications to the existing cooling and ventilation systems.
Additionally, a new Tea Point for staff was installed within a room previously used as a store.
The client engaged consultants to develop the architectural and mechanical/electrical design elements of the project, along with a Commercial Manager to oversee finances and expenditure.
The design requirements adhered to a national template/design guide, ensuring tried, tested, and proven aspects of the project.